After working in this sports hall more than 10 years ago, we again received the order to renovate the De Staver sports hall, which now has even more rooms. In this job we were able to install more than 1,200 m2 of Sonodamp G100 panels. These sandwich panels were used for locker rooms, sanitary facilities and storage rooms. On the hall side, the perforated version was installed to improve the acoustics in the hall. To properly install the panels, a Hoeflon C6 mini crane with suction cup was used. In this way, both the short and the long panels can be easily installed.